We stepped out and embraced three work sites Sunday through
Thursday within the state of Zacapa. The three sites varied in their offerings
and needs so we divided into groups based on these needs. Some individuals
rotated between the sites throughout the week while some individuals stayed
primarily at the same site.
The three sites included...
Volunteer Fire
Department where the group worked on removing the debris where stairs had been
demolished to replace with new non-deteriorating stairs, and then begin the
process of rebuilding the wall and building frames for the stairs. Frames were
built with rebar and wire. Youth learned the mechanics of cement making, laying
brick, and more.
Pueblo
Modelo, the community in which we delivered food and clothes to on Saturday was
our second home. There the group worked on rebar frames for a bathroom on the
side of the school, building wooden walls with doors to separate a classroom
into two, and playing with the children during their morning break.
Thirdly,
the majority of the group worked at the HIM Nutrition Center plus complex. The
complex currently has three main buildings which some are still in progress.
The first building is the Nutrition Center built of wood. It was in need of
weather protectant having not been touched for many years. Therefore, the team
varnished the exterior of the building along with the interior open gazebo area
which is also exposed to the outside elements. The wood was in such need of
protectant that we quickly ran out of varnish and had to patiently wait for
more varnish to come in from Guatemala City via one of the Bomberos.
Behind the
Nutrition Center is an orphanage, which officially opened after we left, and
they are in the process of building a senior center/living corridors for longer
term missionaries. In the middle rests a gazebo/patio area and eventually going
down the hill from the gazebo the hopes of a hotel for short term missionaries.
To connect all of these buildings, sidewalks are being built with cinder block/rock
walls with plants alongside the walks. The team also assisted in cementing
slate rock to the cinder block walls, moving dirt, and planting flowers along
the sidewalks. One day the team even moved 400 concrete blocks for the actual
sidewalks into piles to quicken the contractors lying of the actual sidewalks.
No comments:
Post a Comment